Six builders on this page, and two names you would expect to see are missing. That is the part worth reading first.
Sacramento is a hard market to shop for an ADU in, and not because there is nobody good. It is because the highest-profile builder in the region collapsed in 2024 and left hundreds of homeowners with holes in their yards, and most of the “best builders” lists you will find still have not caught up. So I did the boring thing: I pulled every license live off the state board’s own system on the day I wrote this, and I let that decide who made the list.
Two companies that show up on every other Sacramento roundup did not survive that check. One has an expired license with a cancelled bond behind it. The other is under suspension on three separate grounds at once. Both are named further down with the reason, because a list that quietly omits people teaches you nothing.
The short answer
How they compare
| Builder | CSLB license | Status | Coverage | Yelp | Houzz | Specialties | Price | |
|---|---|---|---|---|---|---|---|---|
| A+ Construction & Remodeling | #1007869B - General Building | Active | Not found | 4.9 (approx. 480) | 142 reviews, rating not found | 4.9 | Detached, Garage conversion, Attached, Design-build | Mid |
| Good Life Construction | #979670B - General Building | Active | Not found | 4.8 (approx. 300) | 317 reviews, rating not found | 5.0 | Garage conversion, Attached, Detached, Design-build | Mid |
| IMKAT Homes | #1094866B - General Building | Active | South Bay | 4.9 (approx. 92) | 2 reviews, rating not found | Not found | Detached, Attached, Garage conversion, Design-build | Premium |
| Villa | #1077688B - General Building, C47 - Manufactured Housing | Active | San FranciscoEast BaySouth BayPeninsulaLA CityWestsidePasadena-San GabrielLong Beach | Not found | Not found | Not found | Prefab, Detached | Premium |
| Redwood ADU | #1098046B - General Building | Active | Not found | Not found | 5.0 (1 review) | Not found | Detached, Design-build | Mid |
| JC Construction & Remodeling | #884936B - General Building | Active | Not found | 4.7 (approx. 135) | 3.8 (approx. 23) | Not found | Garage conversion, Attached, Detached, Design-build | Mid |
Ratings collected August 2, 2026. Always verify a license yourself at cslb.ca.gov before signing.
Scroll the table sideways to see every column.
The 6 builders that passed
Issued October 2, 2015. Verified against cslb.ca.gov on August 2, 2026.
- 4.9 (approx. 480)
- Yelp
- 142 reviews, rating not found
- Houzz
- 4.9
- Not found
If I had to send a Sacramento homeowner to one builder without knowing anything else about their project, it would be this one. The license checks out clean: active B-General since 2015, bond on file, workers comp current, and it holds up when I pull it live rather than through an aggregator. What sells me is the review depth, because roughly 480 Google reviews and 142 on Yelp is a volume you only get by finishing a lot of jobs, and the recurring theme in them is organization and in-house permit handling rather than granite countertops.
The thing I would push on is the entity history. This license was reissued to another entity in 2016 and there is an older A+ license that expired and got cancelled after a Secretary of State dissolution in 2020, which is common enough in this trade but worth one direct question before you sign. Ask who holds the paper today and who carries the warranty.
What works
- Deepest review base of any builder on this list, across Google, Yelp and Houzz
- Handles permitting in house, which is the part homeowners underestimate
- Publishes an actual price range instead of making you call for it
What to check
- The license was reissued to a different entity in 2016, so ask what carried over
- An earlier related license (#1035139) expired and was cancelled in 2020
They publish a $110,000 to $290,000 ADU range on their own site, which is more than most builders here will put in writing. For what an ADU costs in this market before you talk to anyone, see our Sacramento ADU cost breakdown.
Issued December 20, 2012. Verified against cslb.ca.gov on August 2, 2026.
- 4.8 (approx. 300)
- Yelp
- 317 reviews, rating not found
- Houzz
- 5.0
- Not found
Garage conversions are where this one earns its place. Good Life leans on pre-approved Sacramento City and County plan sets, and if you have never watched a permit counter handle a pre-approved plan versus a custom set, the difference is weeks, sometimes more. Their review record is the other reason I rate them: 317 Yelp reviews on a contractor this size is not something you can buy your way to, and the text of those reviews keeps circling back to communication and in-house crews.
One correction to the marketing. They say since 2009, and the CSLB record says the corporation’s license was issued in December 2012. The 2009 date belongs to an earlier sole proprietorship that was cancelled by request at the end of 2013. That is not a red flag, it is just a different thing than what the website implies, and I would rather you hear it from me than find it yourself halfway through a bid comparison.
What works
- 317 Yelp reviews is an unusually deep record for a contractor this size
- Builds off pre-approved city and county plans, which shortens permitting
- In-house crews rather than a stack of subs you never meet
What to check
- The "since 2009" claim belongs to a predecessor sole proprietorship that was cancelled in 2013
- The corporation's own license dates to December 2012, not 2009
They market price-friendly layouts and build off pre-approved Sacramento City and County plans, which is where the real savings sit. For what an ADU costs in this market before you talk to anyone, see our Sacramento ADU cost breakdown.
Issued August 1, 2022. Verified against cslb.ca.gov on August 9, 2026.
- 4.9 (approx. 92)
- Yelp
- 2 reviews, rating not found
- Houzz
- Not found
- Not found
IMKAT is the one I would look at for a custom stick-built ADU that is not a catalog product, and they do it at a volume most boutique firms cannot. The license is clean: active B-General, issued August 2022, good through August 2028, workers comp current into 2027. Well, sort of clean. The company presents itself as founded in 2016, and the license doing the work today was issued in 2022, which is a gap worth asking about rather than assuming.
One item changed when I re-read the record on August 9, 2026, and it is the first thing I would raise with them. Their contractor’s bond now carries a cancellation date of September 2, 2026. A contractor’s bond is what keeps the license active, so if that date passes without a replacement filed, an active license becomes a suspended one and your build stops. It may well be a routine carrier switch. Ask, and ask before you sign anything.
Here is the other honest caveat, and it is the reason they are not higher. The aggregate rating is 4.9, but it sits on a thin independent base, and BBB carries real complaints including a delayed or abandoned project and a retaining-wall permit dispute. A high average on ninety-odd reviews does not cancel out a specific homeowner who got left mid-build. If you are going to hire them, ask for three recent Sacramento addresses you can drive past and two homeowners you can actually call.
What works
- Genuinely ADU-focused rather than a remodeler with an ADU page
- License is active and clean through August 2028, workers comp current to 2027
- Custom stick-built work at a volume most boutique shops cannot match
What to check
- Their contractor's bond carries a cancellation date of September 2, 2026, and a lapsed bond puts an active license straight into suspension
- BBB records show real complaints including a delayed project and a permit dispute
- Thin independent review volume, so the 4.9 rests on a small base
- Company claims a 2016 founding but the operating license was only issued in 2022
Positioned premium, with no published range. You will have to get a bid to find out where you land. For what an ADU costs in this market before you talk to anyone, see our Sacramento ADU cost breakdown.
Issued July 1, 2021. Verified against cslb.ca.gov on August 9, 2026.
- Not found
- Yelp
- Not found
- Houzz
- Not found
- @_VillaHomes_
Villa is the prefab option I can actually stand behind on paper, and the reason is a detail most comparison pages miss. Their license carries a C47 Manufactured Housing classification alongside the B-General, which is the classification a prefab builder is supposed to hold, and plenty of companies selling “modular” ADUs do not have it. Active since July 2021, bond and workers comp both current when I checked.
The catch is that there is almost nothing to read. No Google presence I could verify, no Yelp record, no Houzz. For a company founded in 2019 that is unusual, and it means you are buying on the strength of the product and the paperwork rather than on other homeowners’ experiences. If predictable pricing and a fixed scope matter more to you than a thick review file, that trade is defensible. Just go in knowing you are making it.
One housekeeping note. When you look Villa up yourself you may hit a second record, #1139781, registered as a sole ownership at the same San Francisco address and marked inactive. That is not the operating license. The one doing the work is #1077688.
What works
- Carries a C47 Manufactured Housing classification, which is the correct one for prefab
- Turnkey scope covering design, permitting, delivery and install
- Published starting prices, so you can price a model before a sales call
What to check
- No usable public review record on Google, Yelp or Houzz
- A second Villa registration (#1139781) sits inactive, so quote the right number when you verify
Published starting prices run from roughly $199,000 to $309,000 and up depending on the model. For what an ADU costs in this market before you talk to anyone, see our Sacramento ADU cost breakdown.
Issued October 24, 2022. Verified against cslb.ca.gov on August 2, 2026.
- Not found
- Yelp
- 5.0 (1 review)
- Houzz
- Not found
- Not found
Redwood is the smallest operation on this list and the one with the best paperwork, which is a combination I do not see often. Licensed October 2022, and beyond the standard $25,000 contractor bond they carry a $100,000 LLC employee bond and two million in liability coverage. That is not a marketing claim, it is on the CSLB record, and it tells you something about how they think about risk.
They keep around 70 percent of the work in house. On a small detached build that usually means fewer handoffs and fewer weeks lost waiting on a sub who is finishing someone else’s job. The obvious problem is that there is nearly nothing to read about them: one Yelp review, no Google presence I could verify. Honestly, I go back and forth on how to weigh that. A short record is not a bad record, but it is not a good one either, and on a boutique builder you are betting on the person more than the company.
What works
- Carries a $100,000 LLC employee bond on top of the standard $25,000 contractor bond
- Two million in liability coverage on file
- Around 70 percent of work done in house rather than subbed out
What to check
- Almost no public review footprint, one Yelp review total
- Licensed only since October 2022, so the track record is short
No published range. Positioned mid-market, with roughly 70 percent of the work kept in house. For what an ADU costs in this market before you talk to anyone, see our Sacramento ADU cost breakdown.
Issued September 27, 2006. Verified against cslb.ca.gov on August 2, 2026.
- 4.7 (approx. 135)
- Yelp
- 3.8 (approx. 23)
- Houzz
- Not found
- Not found
JC is the pick when the ADU is not the whole job. If you are reworking the main house and adding a unit out back, a generalist who has been doing both since 2006 is worth more than an ADU specialist who will treat your kitchen as an afterthought. The license is the longest-running on this page, active without a gap for twenty years.
Two things stop me short of a stronger recommendation. First, the platform gap: 4.7 on Google against 3.8 on Yelp is wide enough that I would read the one-star Yelp reviews before the five-star Google ones and ask about whatever you find. Second, and this is the one that actually matters right now, the contractor’s bond on this license carries a cancellation date of August 10, 2026. If that goes through without a replacement bond on file, the license goes to suspension, and a suspended license means they cannot legally contract with you. Pull the record yourself before you sign anything.
Worth knowing too: the licensed entity is registered in Denair, down in Stanislaus County, not Sacramento. That is legal and common, but confirm which entity your contract names.
What works
- Longest licence history here, continuously active since 2006
- Comfortable running an ADU alongside a remodel or addition on the same lot
What to check
- The contractor's bond carries a cancellation date of August 10, 2026, so re-check before signing
- Yelp sits at 3.8 against 4.7 on Google, and that gap deserves an explanation
- The licensed entity is registered in Denair, not Sacramento
No published ADU range. Mid-market positioning based on their own project descriptions. For what an ADU costs in this market before you talk to anyone, see our Sacramento ADU cost breakdown.
Who did not make the list, and why
These names appear on other Sacramento builder roundups. They are not on this one, and here is exactly what the state board's record says about each.
Golden State ADUs
License ExpiredCSLB #1067877, checked August 2, 2026
I had Golden State pencilled in as the design-build specialist on this list until I pulled the license, and then it came apart.
The number they publish, #1067877, resolves to Golden State Construction, a sole ownership registered in Citrus Heights. The license expired on August 31, 2024, and the contractor’s bond behind it was cancelled in November 2023. CSLB’s own record says it will need a bond to renew active or reactivate. There is also a date problem: the company describes itself as established in 2024, but the only license it publishes was issued in August 2020.
None of that tells you the people are bad at building. It tells you that on the day I checked, the paperwork that lets them legally contract with you was not in place, and that is a bright line rather than a judgment call. If they reinstate, I will re-check and reconsider.
Abodu
License SuspendedCSLB #1073522, checked August 9, 2026
Abodu was going to be the premium prefab pick. It is the best-known brand in this category, roughly 69,000 people follow it on Instagram, and the product photographs beautifully.
The license does not hold up. As of August 2, 2026, CSLB shows #1073522 under suspension for three separate reasons at once: lack of a qualifier, a contractor’s bond suspension after the bond was cancelled in March 2026, and failure to comply with workers compensation after the policy lapsed in May 2026. Any one of those would be enough to keep a company off this page. Three at the same time is a company with a paperwork problem, whatever is happening on the build side.
CSLB notes that a bond or a workers comp certificate may have been received and not yet processed, in which case a suspension gets lifted retroactively. So this could be a filing lag rather than a collapse. It is still not a name I will put in a ranked list while the record reads suspended, and it is not a name you should sign with until you have pulled it yourself and seen it come back active.
How we picked
I started with every ADU builder that ranks or advertises in the Sacramento market, then cut the list down on four things.
License status comes first, and it is the only one that can end the conversation on its own. Every CSLB number on this page was read live off cslb.ca.gov on August 2, 2026, using the license-number lookup rather than an aggregator like BuildZoom or BBB. Aggregators go stale, and in this market a stale license record is exactly how homeowners got hurt. Any license that came back suspended, revoked, expired, or not found took that builder out of the ranked list, and I say who and why rather than quietly dropping them.
Review volume across platforms comes second. A 5.0 built on one review tells you nothing. I looked at Google, Yelp and Houzz together, because a builder who is excellent on one platform and mediocre on another is telling you something, and the gap is usually more informative than either number alone.
Specialization comes third. A general remodeler who added an ADU page in 2023 is not the same as a shop that has built nothing else for five years, and neither is automatically better. It depends on your project, which is why the best-for tags exist.
Project evidence comes fourth: published price ranges, pre-approved plan sets, open houses, in-house crews, bond and insurance filings above the legal minimum. Things a company has to actually do rather than claim.
Two things I want to be plain about. We do not take payment for placement, and no builder on this page has paid us anything or been told they are on it. And ratings are the weak link in this research: they come from aggregator summaries, not from Google or Yelp's live widgets, so treat every one of them as approximate. Where a source reported a range, I used the lower figure.
Last updated August 2, 2026.
Frequently asked questions
How much do ADU builders charge in Sacramento?
The builders on this page who publish numbers land between roughly $110,000 and $310,000, which is a wide enough spread to be almost useless without knowing your lot. A+ Construction publishes a $110,000 to $290,000 range, and Villa's prefab models start around $199,000 and run past $309,000 depending on the unit.
That spread is driven by size, whether you are converting an existing structure or building new, and how much site work your lot needs. Our Sacramento ADU cost breakdown goes through where the money actually goes, and the underlying figures sit in the ADU Wizard Data Hub.
How do I verify a CSLB license myself?
Go to CSLB's Check A License page, type the license number into the license-number box, and read the detail page it returns. It takes about thirty seconds and it is free.
Four things to read, in this order. Status should say the license is current and active, and anything else means they cannot legally contract with you right now. Classification should include B - General Building for most ADU work, plus C47 for a prefab builder. Bonding should show a contractor's bond with no cancellation date sitting in the near future. Workers' compensation should show a current policy, or an exemption if the company genuinely has no employees.
Check the business name on the record against the name on your contract. If they do not match, ask why before you go further.
What should I ask a Sacramento ADU builder before signing?
Ask for the CSLB number in writing and check it yourself while you are sitting there. Ask which legal entity the contract names, because it is not always the brand on the truck. Ask for three recent addresses in your area you can drive past, and two homeowners you can call.
Then ask about money. What is the deposit, what does the payment schedule look like against milestones, and what happens to your money if the company stops work. California limits a residential down payment to the lesser of $1,000 or 10 percent of the contract price, and a builder pushing for a large payment up front is the single loudest warning sign in this trade.
What happened to Anchored Tiny Homes?
Sacramento's highest-profile ADU builder collapsed. CSLB revoked its license, the founders filed personal Chapter 7 bankruptcy, and reporting at the time put the number of affected California homeowners above 450.
The full account, with sources and the disputed complaint count, is in the warning box on this page. It is the reason the license check sits at the top of this page instead of the bottom.
