In every Massachusetts city and town except Boston, one ADU of up to 900 sq ft is allowed by right in single-family districts, so you need a building permit, not a special permit. Towns can still require site plan review, Title 5 septic compliance and reasonable fees. The state counts 2,084 ADUs approved in 2025 and the first half of 2026.
Last verified: November 8, 2026
Massachusetts made the hard part of an ADU easy and left the practical part to your town. Since February 2, 2025, a single ADU in a single-family district is allowed by right in 350 of the state’s 351 municipalities, so nobody gets to vote on whether you can build it. What is left is a building permit, and in many towns a site plan review and a board of health sign-off. This page walks through that process. For what the law itself allows, see our Massachusetts ADU law guide.
What Changed for Massachusetts ADU Permits in 2026
Three things. First, the numbers: the state’s ADU tracker counts 2,084 ADUs approved and 2,824 applications across 2025 and the first half of 2026. Second, the money: MassHousing began offering ADU second mortgages on March 17, 2026, and on July 21, 2026 the state launched Phase One of an ADU Incentive Program with the Massachusetts Housing Partnership (MHP), backed by $10 million over two years. Third, the rules towns apply are being tightened: the state proposed amendments to 760 CMR 71.00 and took comments from September 11 to October 9, 2026. Until final rules are published, the January 31, 2025 regulation is the one your town must follow.
What State Law Guarantees You
Under M.G.L. c. 40A, section 3, as amended by the Affordable Homes Act, and the regulation 760 CMR 71.00:
- No special permit for one ADU. A town may not prohibit, unreasonably restrict or require a special permit or other discretionary zoning approval for a single ADU in a single-family district. A second ADU on the same lot can still need a special permit.
- Up to 900 sq ft. The lesser of 900 sq ft or half the gross floor area of the main house. A town can allow more but not less.
- No owner occupancy, no family requirement. A town cannot require you to live in either unit or limit who lives in the ADU.
- Parking capped. At most one added space, and none within half a mile of a commuter rail, subway, ferry or bus station.
- No lot-size minimums. Towns cannot impose minimum lot sizes or lot-based density limits such as floor area ratios on a Protected Use ADU.
- Dimensional rules no stricter than the house. Setbacks, coverage, height and bulk can be no stricter than the most permissive standard for the house, a single-family home or an accessory structure in the district.
- Modular units allowed. A town cannot ban a modular ADU on a code-compliant foundation connected to utilities.
How to Get an ADU Permit in Massachusetts, Step by Step
- Confirm your district. The by-right rule covers districts where single-family homes are allowed. Your town’s zoning map or the planning office will tell you. If you are in Boston, skip to the Boston section below.
- Order a feasibility study (optional, cheap). MHP’s ADU Incentive Program lets any Massachusetts property owner get one feasibility study from a provider in its directory. MHP pays the provider $500 per completed study, and the study covers site conditions, zoning, utilities, a preliminary design and a high-level budget. It does not include construction drawings.
- Check septic or sewer early. On septic, the ADU adds flow under Title 5 (310 CMR 15.000), so your board of health decides whether the system needs an upgrade. This is the step most likely to change your budget.
- Ask whether your town requires site plan review. Towns may require it, and the fee must be reasonable. The draft 2027 rules would require site plan review standards to be written, clear and objective.
- Pick a design. The state’s ADU Design Challenge Showcase has free designs you can download, and MassCEC’s ADU Resource Center lets you see how one would sit on your lot.
- Apply for the building permit. All Protected Use ADU construction needs a building permit from your local building department. Bring the board of health approval (if on septic), the site plan approval (if required) and construction documents.
- Line up utilities. A separate water, sewer or electric connection can be required only by the utility or certain boards, and that requirement must also pass the reasonableness test.
- Build, pass inspections and rent if you like. Long-term rental cannot be unreasonably restricted. A town may restrict or ban short-term rentals (31 days or fewer).
What Your Town Can Still Require
The state’s test for every local rule is reasonableness under 760 CMR 71.03(3): a requirement cannot be so costly, slow or arbitrary that it works as a ban. In practice, towns can still require:
- Site plan review, with a reasonable fee.
- Title 5 compliance and, where it passes the reasonableness test, local septic rules beyond Title 5. A blanket new-system mandate can be unlawful on lots too small for a second system.
- Reasonable fees for the building permit, site plan review and water, sewer and utility connections.
- Setback, height and bulk rules, no stricter than for the house or an accessory structure.
- A short-term rental ban on the ADU.
What they cannot require: owner occupancy, a family relationship, a special permit for the first ADU, a minimum lot size, or more than one parking space.
Boston Is Different
Boston is the one municipality not covered, because it is not subject to M.G.L. c. 40A. Boston allows an internal ADU in owner-occupied one- to three-family homes citywide, but most attached and detached ADUs still need a Zoning Board of Appeal variance, outside parts of Mattapan. See our Boston ADU permit guide for the details and the city’s loan program.
Paying for It
- MassHousing ADU loans. Fixed-rate second mortgages of up to $250,000 since March 17, 2026, for low- and moderate-income homeowners.
- MHP feasibility studies. One study per property, with MHP paying the provider $500.
- Community ADU Pilot. The $5 million pilot announced October 15, 2026 is for affordable housing developers building 20 to 30 income-restricted ADUs, not individual homeowners.
- No statewide $25,000 homeowner grant. As of November 8, 2026, we found no state program that gives homeowners a $25,000 ADU grant. MHP says later phases of its incentive program will follow, with no details yet.
For what an ADU costs to build here, see our Massachusetts ADU cost guide.
Can an HOA Block an ADU in Massachusetts?
Possibly. The state’s FAQ says the ADU law does not address homeowners associations, which may allow or restrict ADUs under their own rules. Condominium conversions also stay under M.G.L. c. 183A. Read your HOA documents before you pay for design.
Frequently Asked Questions
Do I need a permit to build an ADU in Massachusetts?
Yes, a building permit from your local building department, plus board of health approval if you are on septic and site plan review if your town requires it. You do not need a special permit for the first ADU in a single-family district outside Boston.
How long does an ADU permit take in Massachusetts?
The state sets no ADU-specific deadline. Timing depends on your building department, and on whether you also need site plan review or a septic upgrade. Ask your building department for its current turnaround before you schedule a contractor.
How much does an ADU permit cost in Massachusetts?
Each town sets its own fees, but every fee, including utility connection fees, must pass the reasonableness test in 760 CMR 71.03(3). The draft 2027 rules would make a fee a town does not charge a single-family home presumptively unreasonable.
Can my town make me get a special permit for an ADU?
Not for one ADU in a single-family district. A town may require a special permit for a second ADU on the same lot.
What are the ADU requirements in Massachusetts?
Up to 900 sq ft or half the house, whichever is smaller; at most one parking space (none near transit); no owner-occupancy or family rule; and dimensional rules no stricter than for the house. Title 5 septic rules and a building permit still apply.
Is there an ADU grant in Massachusetts?
Not a direct homeowner grant as of November 8, 2026. The state offers MHP-funded feasibility studies and MassHousing loans of up to $250,000. Boston runs its own assistance program for income-eligible owners.
Does the Massachusetts ADU law apply in Boston?
No. Boston has its own ADU rules and programs, covered in our Boston ADU permit guide.
Sources
- Massachusetts EOHLC, Accessory Dwelling Units (guidance, tracker and resources): https://www.mass.gov/info-details/accessory-dwelling-units
- Massachusetts EOHLC, Accessory Dwelling Unit (ADU) FAQs: https://www.mass.gov/info-details/accessory-dwelling-unit-adu-faqs
- Massachusetts EOHLC, ADU Law (Acts of 2024, Chapter 150, Sections 7 and 8): https://www.mass.gov/info-details/adu-law-acts-of-2024-chapter-150-section-7-and-8
- Office of the Governor, statewide ADU Incentive Program launch (July 21, 2026): https://www.mass.gov/news/governor-healey-launches-statewide-program-to-help-homeowners-build-accessory-dwelling-units
- Massachusetts Housing Partnership, ADU Incentive Program: https://www.mhp.net/one-mortgage/adu-incentive-program
- Office of the Governor, MassHousing ADU financing (March 17, 2026): https://www.mass.gov/news/governor-healey-and-masshousing-launch-affordable-adu-financing-for-massachusetts-residents
- Office of the Governor, $5 million Community ADU Pilot (October 15, 2026): https://www.mass.gov/news/governor-healey-announces-5-million-to-make-it-easier-and-more-affordable-to-build-adus
This page is general information, not legal advice. Confirm the current rules with your town’s building department, planning office or board of health before you build.
Cities in Massachusetts
City-level ADU permit rules and timelines within Massachusetts.
