Fourteen builders went into this page. Eight came out, and the six that did not are named below with the reason.
Two of those checks are the whole argument for doing this live. One builder that every secondary source listed as active, and that a competing license-verification directory still recommends, turned out to be under suspension with a bond that cancelled eleven days before I looked. Another that the research had down as license not found has in fact held an active license since 2007, with electrical and plumbing classifications most of this list does not carry. Stale data does not just let bad builders through. It also keeps good ones out.
Los Angeles is five markets wearing one name, so every builder here carries the sub-regions they actually work in. And before you shortlist anyone, read the warning box. The LA case involves two homeowners who lost $84,000 and $200,000, and a company whose state record looked clean right up until a television station started asking questions.
The short answer
How they compare
| Builder | CSLB license | Status | Coverage | Yelp | Houzz | Specialties | Price | |
|---|---|---|---|---|---|---|---|---|
| NEO Builders ADU | #1114778B - General Building | Active | LA CitySan Fernando ValleyPasadena-San Gabriel | 4.9 (approx. 136) | 18 reviews, rating not found | Not found | Detached, Garage conversion, Design-build | Mid |
| Otto ADU | #1081287B - General Building | Active | LA CityWestsidePasadena-San Gabriel | 4.9 (approx. 11) | Not found | Not found | Detached, Garage conversion, Design-build | Premium |
| AP Remodeling | #1049032B - General Building | Active | LA CityWestside | 4.9 (approx. 140) | 117 reviews, rating not found | 5.0 (approx. 93) | Attached, Garage conversion, Detached, Design-build | Mid |
| Quality First Builders | #990316B - General Building | Active | LA CitySan Fernando Valley | 5.0 (approx. 80) | 109 reviews, rating not found | 5.0 (approx. 39) | Detached, Garage conversion, Attached, Design-build | Premium |
| Backyard Estates | #1076065B - General Building | Active | LA CityPasadena-San GabrielLong Beach | 4.9 (approx. 23) | Not found | Not found | Detached, Garage conversion, Attached | Mid |
| Villa | #1077688B - General Building, C47 - Manufactured Housing | Active | LA CityWestsidePasadena-San GabrielLong Beach | Not found | Not found | Not found | Prefab, Detached | Premium |
| Waconah Construction | #908219B - General Building, C10 - Electrical, C36 - Plumbing | Active | LA CityWestsideLong Beach | Not found | Not found | Not found | Detached, Garage conversion, Attached | Mid |
| LA Family Builders | #1120579B - General Building | Active | LA CitySan Fernando Valley | 4.8 (approx. 101) | Not found | Not found | Garage conversion, Detached, Design-build | Mid |
Ratings collected August 2, 2026. Always verify a license yourself at cslb.ca.gov before signing.
Scroll the table sideways to see every column.
The 8 builders that passed
Issued January 9, 2024. Verified against cslb.ca.gov on August 2, 2026.
- 4.9 (approx. 136)
- Yelp
- 18 reviews, rating not found
- Houzz
- Not found
- Not found
NEO is the most reviewed dedicated ADU builder in Los Angeles and the reviews keep landing on the thing that actually matters here, which is getting through LADBS. Permit navigation is where LA projects die, and a builder who submits there constantly knows which corrections that plan checker issues before they issue them. Their marketed six-week garage conversion is aggressive, but garage conversions are the one ADU type where that is physically possible when the permit is clean.
There is a structure question you need to ask before signing, though. There are two active CSLB licenses here under the same qualifying individual: #1061134, NEO Builders Inc, licensed December 2019 and carrying workers compensation through January 2027, and #1114778, NEO Builders and Design Inc, licensed January 2024 and registered as workers comp exempt on the basis of having no employees. Both are active and clean. But a company running high volume with no employees on one entity means that work is subcontracted, and if your contract names the exempt entity, ask who carries comp for the people actually on your lot. An uninsured injury on your property is your problem more often than homeowners expect.
The ratings here are carried from research rather than read live, so treat 4.9 as approximate. Their Houzz profile exists but has no reviews on it at all, which is why that column says not found rather than showing you a number.
What works
- Deepest reported review base of any dedicated LA ADU builder
- Two active licenses under the same qualifier, so there is continuity behind the brand
- Reviews consistently praise LADBS permit handling, which is the part that sinks LA timelines
What to check
- The 2024 license (#1114778) is registered workers comp exempt, certifying no employees
- Ask which of the two licenses your contract names, because only
- Google and Yelp figures are carried from research, not read live
Typical projects described in the $150,000 to $300,000 range, and they market a six-week garage conversion turnaround. For what an ADU costs in this market before you talk to anyone, see our Los Angeles ADU cost breakdown.
Issued September 16, 2021. Verified against cslb.ca.gov on August 2, 2026.
- 4.9 (approx. 11)
- Yelp
- Not found
- Houzz
- Not found
- Not found
Otto came into this research flagged. One source said the license was active, another showed it inactive or expired around September 2025, and that conflict was the single highest-priority thing to resolve on this page. So I pulled it live.
It is active, and it is the cleanest record here. Homestead Build LLC, trading as Otto ADU, licensed since September 2021 and good through September 2027. Beyond the standard $25,000 contractor bond they carry a $100,000 LLC employee worker bond and $1,000,000 in liability insurance, and workers comp runs through January 2027 with no exemption claimed. CSLB does not require liability insurance at all, so carrying it is a choice about how they think about risk. On the paperwork alone, this is the builder I would be most comfortable sending someone to.
That directory conflict is worth sitting with for a second, because it cuts both ways. A stale aggregator record nearly cost a clean builder a place on this list, the same way a stale record can make a failing builder look fine. Neither direction is safe. Pull the license yourself.
The honest limit is the review base: around 11 Google reviews is thin, and the rating is carried from research rather than read live. Strong paperwork and a short public record is a different bet than a long record with paperwork questions. On the Westside, where the lots are tight and the plan checks are fussy, I would still take the strong paperwork.
What works
- Best-bonded license on this page, a $100,000 LLC worker bond on top of the standard $25,000
- Carries $1,000,000 in liability insurance, which CSLB does not require at all
- Workers comp current through January 2027 with no exemption claimed
What to check
- Only around 11 reported Google reviews, the thinnest base of any ranked builder here
- Aggregators disagreed on this license, so re-check it yourself rather than trusting a directory
No published range. Positioned between mid and premium, with both custom and pre-designed plan paths. For what an ADU costs in this market before you talk to anyone, see our Los Angeles ADU cost breakdown.
Issued January 15, 2019. Verified against cslb.ca.gov on August 2, 2026.
- 4.9 (approx. 140)
- Yelp
- 117 reviews, rating not found
- Houzz
- 5.0 (approx. 93)
- Not found
An attached ADU is a harder job than a detached one and most people have it backwards. You are cutting into an existing structure, matching a roofline, tying into an existing panel and an existing sewer lateral, and discovering whatever the last owner did without a permit. A firm whose day job is remodeling has seen all of that. AP Remodeling is a remodeler that does ADUs rather than an ADU shop that will also remodel, and for attached work that is the right way round.
They also have the strongest evidence base I could verify myself. Houzz reads 5.0 across 93 reviews, which I read live on August 2, and 93 is a serious number on that platform. Their Google and Yelp figures are higher still but those are carried from research, so treat them as approximate.
One thing to check before you sign. Their workers compensation policy shows an expiration of August 31, 2026. Policies get renewed constantly and this is very likely routine, but a workers comp lapse puts a license into suspension automatically, and that is not a thing you want to discover mid-build. Pull the record, confirm the policy shows current, then carry on.
What works
- Houzz reads 5.0 across 93 reviews, the deepest live-verified record on this page
- Deep remodeling practice, which matters when the ADU ties into the existing house
- Licensed since 2019 with the same qualifying individual throughout
What to check
- Workers comp policy expires August 31, 2026, so confirm it was renewed before you sign
- Google and Yelp figures are carried from research, not read live
No published ADU range. Mid-market positioning across ADU work and full-house remodeling. For what an ADU costs in this market before you talk to anyone, see our Los Angeles ADU cost breakdown.
Issued February 3, 2014. Verified against cslb.ca.gov on August 2, 2026.
- 5.0 (approx. 80)
- Yelp
- 109 reviews, rating not found
- Houzz
- 5.0 (approx. 39)
- Not found
Twelve years on the same license is a long time in LA residential construction, and it is the first thing I look at when someone claims premium. Quality First has held an active B-General since February 2014, bond on file, workers comp renewed through July 2027, no gaps and no disciplinary anything on the record. Houzz reads 5.0 across 39 reviews, which I read live rather than taking from a directory.
What they get bought for is finish. The recurring theme across their reviews is finish quality and, unglamorously, a clean job site. That second one sounds trivial until you have lived next to your own build for seven months. If the ADU is going to be visible from your kitchen window for the next twenty years, paying for the crew that cares about the trim is not an indulgence.
They do not publish a range, which I hold against most builders and will hold against them too. Premium with no number means the only way to find out is a bid. Get two others for comparison, and make sure all three are quoting the same scope, because premium and mid quotes usually differ as much in what is excluded as in the headline figure.
What works
- Licensed since February 2014, the longest continuous record of the LA site-built firms here
- Houzz reads 5.0 across 39 reviews, verified live
- Workers comp renewed through July 2027 and a bond on file since 2023
What to check
- Premium positioning with no published range, so expect to need a bid to place yourself
- Google and Yelp figures are carried from research, not read live
No published range. Premium positioning, with review themes centered on finish quality and site cleanliness. For what an ADU costs in this market before you talk to anyone, see our Los Angeles ADU cost breakdown.
Issued May 21, 2021. Verified against cslb.ca.gov on August 2, 2026.
- 4.9 (approx. 23)
- Yelp
- Not found
- Houzz
- Not found
- Not found
Backyard Estates does ADUs and nothing else, and you can feel it in how the business is set up: a published set of floor plans, published pricing, and a process built around picking a model rather than starting from a blank sheet. In a market where most builders make you book a call to learn anything, that is worth something on its own.
The paperwork is strong. On top of the standard $25,000 contractor bond they carry a $100,000 LLC worker bond and $2,000,000 in liability insurance, with workers comp running through May 2027. That is the second best-covered license on this page after Otto.
The detail to know is geography. The license is registered in Upland, which is San Bernardino County and a good forty miles east of most of LA. They market across LA County and their published service area covers it, but a crew commuting from Upland to the Westside is a different daily reality than one based in Culver City. Ask where the crew that would actually build yours is based, and how many jobs they run at once. Their review base is also modest at around 23, and I could not verify a Yelp or Houzz record at all.
What works
- $100,000 LLC worker bond and $2,000,000 liability cover, both well above the legal minimum
- ADUs only, not a remodeler with an ADU page
- Publishes floor plans and pricing rather than gating everything behind a sales call
What to check
- The license is registered in Upland, in San Bernardino County, not in LA County
- Around 23 reported Google reviews and nothing verifiable on Yelp or Houzz
Publishes floor plans and pricing on their own site, which most LA builders will not do. For what an ADU costs in this market before you talk to anyone, see our Los Angeles ADU cost breakdown.
Issued July 1, 2021. Verified against cslb.ca.gov on August 9, 2026.
- Not found
- Yelp
- Not found
- Houzz
- Not found
- @_VillaHomes_
Villa is the prefab option I can actually stand behind on paper, and the reason is a detail most comparison pages miss. Their license carries a C47 Manufactured Housing classification alongside the B-General, which is the classification a prefab builder is supposed to hold, and plenty of companies selling “modular” ADUs do not have it. Active since July 2021, bond and workers comp both current when I checked.
The catch is that there is almost nothing to read. No Google presence I could verify, no Yelp record, no Houzz. For a company founded in 2019 that is unusual, and it means you are buying on the strength of the product and the paperwork rather than on other homeowners’ experiences. If predictable pricing and a fixed scope matter more to you than a thick review file, that trade is defensible. Just go in knowing you are making it.
One housekeeping note. When you look Villa up yourself you may hit a second record, #1139781, registered as a sole ownership at the same San Francisco address and marked inactive. That is not the operating license. The one doing the work is #1077688.
What works
- Carries a C47 Manufactured Housing classification, which is the correct one for prefab
- Turnkey scope covering design, permitting, delivery and install
- Published starting prices, so you can price a model before a sales call
What to check
- No usable public review record on Google, Yelp or Houzz
- A second Villa registration (#1139781) sits inactive, so quote the right number when you verify
Published starting prices run from roughly $199,000 to $309,000 and up depending on the model. For what an ADU costs in this market before you talk to anyone, see our Sacramento ADU cost breakdown.
Issued December 19, 2007. Verified against cslb.ca.gov on August 2, 2026.
- Not found
- Yelp
- Not found
- Houzz
- Not found
- Not found
This one nearly did not make the page. The research had Waconah down as license not found, which under my own rules means no ranking. A name search at the state board turned up an active record straight away: #908219, Waconah Construction of Inglewood, licensed since December 2007.
And it is a more interesting license than most here, because it carries three classifications: B General Building, C10 Electrical and C36 Plumbing. On an ADU that matters more than it sounds. Electrical and plumbing are the two trades most likely to be subbed out, most likely to be the reason your schedule slips while everyone waits on one guy, and most likely to be where a rough inspection fails. A contractor licensed to do both in house controls that directly.
What I cannot give you is a review record. Nothing verifiable on Google, Yelp or Houzz, and the fact that a secondary research pass could not even find their license tells you how little of a public footprint they keep. Eighteen years of continuous licensure says the work exists. You will have to go get the references yourself, and on the Westside and down toward the beach cities I would ask specifically for jobs on lots like yours.
What works
- Holds B General Building plus C10 Electrical and C36 Plumbing on one license
- Licensed since December 2007, second longest record on this page
- Workers comp current and a bond on file since 2023
What to check
- No verifiable rating on Google, Yelp or Houzz
- Research had this license down as not found, which tells you how thin their public footprint is
No published range. For what an ADU costs in this market before you talk to anyone, see our Los Angeles ADU cost breakdown.
Issued May 9, 2024. Verified against cslb.ca.gov on August 2, 2026.
- 4.8 (approx. 101)
- Yelp
- Not found
- Houzz
- Not found
- Not found
If budget is the binding constraint, this is where I would start in the Valley. The recurring theme across roughly 101 reported Google reviews at 4.8 is fair pricing and schedules that hold, which is a more useful pair of signals than a 5.0 built on a dozen reviews.
Two things to weigh against that. The license was issued in May 2024, which makes it the youngest on this page by a wide margin, and the qualifying individual on the record changed in June 2026, about two months before I pulled it. A qualifier change is routine paperwork most of the time. It can also mean the person whose experience the license rests on has just walked out the door. Ask who the qualifier is, how long they have been with the company, and how many completed ADUs they personally ran.
One more thing, and it is not a knock on their building. LA Family Builders publishes its own “best ADU contractors in Los Angeles” listicles. Plenty of firms do it. Just do not read a ranking published by a company that competes in that ranking as independent, including when it flatters someone else on this page.
What works
- Around 101 reported Google reviews at 4.8, strong volume for a young license
- End to end design, permit and build rather than handing you between firms
- Bond and workers comp both current with no gaps on the record
What to check
- License only issued May 2024, the newest of any ranked builder here
- The qualifying individual on the record changed in June 2026, two months before this check
- They publish their own best-of ADU builder lists, so read those as marketing
No published range. Review themes centre on fair pricing and schedule reliability. For what an ADU costs in this market before you talk to anyone, see our Los Angeles ADU cost breakdown.
Who did not make the list, and why
These names appear on other Los Angeles builder roundups. They are not on this one, and here is exactly what the state board's record says about each.
Go ADU Construction
License SuspendedCSLB #1076712, checked August 2, 2026
This is the one that changed the shape of the page, and it is the clearest argument I have for why live license checks are not optional.
Go ADU was set to be the San Fernando Valley pick. ADU-exclusive, founded 2020, guaranteed pricing against LADBS pre-approved plans, around 27 Google reviews at 4.9, and featured on the competing license-verification directory that markets a daily CSLB sync. Everything about the secondary picture said include them.
The live record says under suspension. Vaisman Construction Inc, license #1076712, suspended for Contractors Bond Suspension, with the bond showing a cancellation date of July 22, 2026. That is eleven days before I checked. A suspended contractor cannot legally enter into a contract with you.
CSLB notes that a replacement bond may have been filed and not yet processed, in which case the suspension lifts retroactively. So this may already be resolved by the time you read it. That does not change today’s answer: while the record reads suspended, they are off the list. Pull the license before you talk to them, and if it comes back active with a current bond, the rest of their case is genuinely good.
Precise Group
License Not foundCSLB #, checked August 2, 2026
Precise Group markets “35+ years of experience”, and that is exactly the claim a license record exists to substantiate.
I could not find one. No CSLB record came back under this business name on August 2, 2026, and there is no license number published on their site to check against. A name search returns unrelated companies, including an HVAC sole ownership in Fresno.
Thirty-five years of work would leave a thirty-five year paper trail, and a contractor with that history usually leads with the number because it is their best asset. Ask for the license number and the legal entity name before anything else. If it comes back active, the tenure claim becomes checkable and the conversation is worth having. Until then there is nothing here to verify.
ADU Build LA
License Not foundCSLB #, checked August 2, 2026
ADU Build LA states on its own site that it holds an active Class B license, and claims 200 or more completed ADUs. It does not publish the license number.
That combination is the problem. I could not match a CSLB record to this business name on August 2, 2026. The closest name match, ADU Builder and Construction Inc of Encino, is a different company, and that license expired on June 30, 2026 anyway. I am not going to attribute someone else’s license to them, and I am not going to rank a builder on a claim I cannot check.
Stating you are licensed and publishing the number are two different acts. The second one costs nothing and settles the question in thirty seconds. Ask for it directly.
Not contractors, but worth knowing
These companies come up constantly in this market and none of them can be ranked as a builder, because none of them is one. That is a description, not a criticism. Two of them may still be the right first call depending on what you need.
Plant Prefab
Not a general contractorPlant Prefab is a factory-built housing manufacturer, and this is the nuance the page has to get right rather than flatten.
No CSLB contractor license came back under the name. On its own that would exclude a site-built contractor. Here it does not mean unlicensed, it means the oversight runs through a different agency: California’s HCD factory-built housing program certifies the factory and the units built in it, rather than CSLB licensing a contractor to build on your lot. That is the same distinction that separates Villa, which holds B plus the C47 Manufactured Housing classification, from Samara, which holds B alone, and from manufacturers like this one that hold no CSLB number at all. Three legitimate structures, three different things to verify.
So what should you actually check? Ask for the HCD certification for the factory and the approved plan set, and ask who holds the contractor license for the site work: the foundation, the utility connections, the crane day and the final tie-in. That is real construction on your property and it needs a licensed contractor behind it, whether that is Plant Prefab’s own partner or someone you hire. A beautiful factory unit sitting on unpermitted site work is still a problem.
CALI ADU
Not a general contractorCALI ADU is a design and permitting firm, and to their credit they say so themselves rather than leaving you to work it out. Their own site states plainly that construction is performed by independent licensed California general contractors under separate contract with the property owner, and that CALI ADU is not a licensed California general contractor.
That is exactly the disclosure I want to see, and it is the reason they are here rather than in the excluded list. Nothing is being hidden.
One caution while you are checking. A name search at the state board turns up an active license held by Cali Solar Inc, trading as Cali ADU Construction, in Northridge. Similar name, different company, and I am not going to attribute that license to this firm. If you are handed a license number in a sales conversation, confirm the business name on the record matches the entity on your contract.
Where they fit: their pitch is a fixed-price permit-ready plan set, and their reported volume of permitted projects suggests they know LADBS, Pasadena, Glendale, Culver City and Santa Monica intake. If you want to own the build side yourself, or you already have a contractor you trust and just need drawings that will clear plan check, that is a real path. You will be signing the construction contract with somebody else, so run that contractor’s license exactly as you would any other.
bunchADU
Not a general contractorbunchADU, the ADU line from Bunch Design, is an architecture practice. No CSLB number is published, and their own site describes construction partners building from their drawings and introducing you to contractors who have built the units before.
So they cannot be ranked here, for the same reason a structural engineer cannot. They are not selling you construction.
They are worth knowing if design is what you actually care about. The ready-to-build sets are properly designed rather than a floor plan with a roof on it, and if you want an ADU that looks like something rather than anything, starting with an architect is the honest route. Just be clear that the introduction to a contractor is not a vetting of that contractor. Run the license yourself, the same as you would for a builder you found on your own.
How we picked
Fourteen candidates went into verification, pulled from the search results for the market's builder queries, from Yelp and Houzz directory pages, and from the competing license-verification directory that already ranks here. Eight came out ranked.
Every CSLB number was read live off cslb.ca.gov on August 2, 2026 using the license-number lookup, not copied from BuildZoom, a directory, or a company's own about page. That distinction earned its keep twice on this page. One builder that every secondary source listed as active and recommended is under suspension. One builder that the research had down as license not found has held an active license since 2007. Stale data fails in both directions.
Suspended, revoked, expired and not-found licenses are excluded from the ranking. Every one of them is named below with the reason, because a list that quietly drops builders teaches you nothing about how it was made.
Los Angeles is five markets, not one. A builder who submits to LADBS every week is not automatically the right pick for Pasadena, and Long Beach runs its own process entirely. Every ranked builder carries the sub-regions they actually serve, and the "best for" tags are assigned by sub-region where one builder is clearly stronger in one.
On ratings I have to be precise about what I did and did not do. Houzz figures were read live off the platform on August 2, 2026 and are marked as such. Google and Yelp figures are carried from the research dataset collected the same day and were not independently re-read, because both platforms blocked automated access. Only the live-read figures are published as structured data; carried numbers appear in the table and nowhere else. Where a source gave a range, I used the lower figure.
After that: how ADU-specific the builder really is, whether prefab firms hold the classification the state maintains for factory-built housing, and how much cover sits behind the license. A $100,000 worker bond or liability insurance that CSLB does not require tells you something about how a company thinks about risk.
We do not take payment for placement. No builder here has paid us anything or been told in advance that they are on this page, and we do not match, vet on your behalf, or pass your details to anyone.
Last updated August 2, 2026.
Frequently asked questions
How much do ADU builders charge in Los Angeles?
The builders here who publish anything land roughly between $150,000 and $300,000 for a finished detached unit, with garage conversions coming in lower because the shell already exists.
What moves that number in LA more than anywhere else is the lot and the jurisdiction. Hillside, fire-zone and coastal lots carry requirements that a flat Valley lot does not. Our Los Angeles ADU cost breakdown walks through where the money goes, and the LA permit guide covers the LADBS side. Underlying figures sit in the ADU Wizard Data Hub.
How do I verify a CSLB license myself?
Go to CSLB's Check A License page, enter the number, and read the record. Free, under a minute.
Read four things. Status should say current and active. Classification should include B General Building. Bonding should show a contractor's bond with no cancellation date in the near future, and you should note any disciplinary bond. Workers' compensation should show a current policy, or a genuine exemption if the company really has no employees.
Then match the business name on the record to the entity on your contract. On this page alone, three builders trade under a name different from the one on their license.
Does a clean complaint history mean a builder is safe?
No, and the Next Generation Builders case is why. NBC4 reported that the company had a clean CSLB record until its investigation began, and the complaints only posted publicly afterwards.
Complaint disclosure is a lagging indicator. It tells you what has already been processed, not what is happening on someone's job site right now. Read the bond dates instead: a bond that has cancelled, or that has a cancellation date coming, is the earliest visible sign that something is wrong.
Which part of Los Angeles does my builder need to know?
More than people expect. LADBS, Pasadena, Glendale, Culver City, Santa Monica and Long Beach all run their own intake, and their plan checkers ask for different things. A builder who submits to one of them every week has a real advantage over one who is learning it on your project.
The coverage column in the table shows which sub-regions each builder actually serves. If you are in Long Beach or out in the San Gabriel Valley, filter on that before you filter on the star rating.
What happened to Next Generation Builders?
Its CSLB license is expired with an unresolved bond payout and public complaint disclosure, and its bond and workers comp both cancelled in autumn 2024. NBC4's I-Team reported homeowners losing $84,000 and $200,000 on abandoned projects.
The full account, with the live license findings and the sources, is in the warning box on this page.
