ADU Permits in Seattle

TL;DR

Seattle allows two ADUs on a lot with a house, including two backyard cottages, under code changes that took effect June 30, 2025. ADUs need no parking, no street improvements and no affordable housing payment, and a pre-approved DADU plan can get a permit in about 2 to 6 weeks, according to the city. Every ADU permit also triggers a King County sewer capacity charge.

Timeline: 2 to 6 weeks with a pre-approved DADU plan; longer for custom plansFees: SDCI permit fees plus a King County sewer capacity chargeDepartment: Seattle Department of Construction and Inspections (SDCI)

Last verified: November 10, 2026

Seattle has been ahead of the state on ADUs for years. It dropped owner occupancy and parking requirements in 2019, and in 2025 it rewrote its code to meet HB 1337 a day before the state deadline. The practical question in Seattle is no longer whether you can build a backyard cottage. It is which permit path gets you there fastest, and what the sewer district will charge you at the end.

What Changed for Seattle ADU Permits in 2026

The big change landed June 30, 2025, when Seattle’s ADU update took effect, according to reporting by The Urbanist. The city’s own code update page describes the package: a new SMC 23.42.022 with common ADU standards for every zone that allows single-family homes, two ADUs per lot including two detached units, and updated height, parking and condo ownership provisions.

According to the same reporting, the update raised the height limit for ADUs in Neighborhood Residential zones to 32 feet (from 18), kept the 1,000 sq ft above-ground size limit in those zones, dropped limits on where an ADU’s entrance can go, and allowed unit lot subdivisions so a DADU can sit on its own unit lot. We could not confirm the ordinance number or every dimensional figure from the city’s pages, so treat those numbers as reported, not verified.

What Seattle Allows

RuleSeattleSource
Number of ADUsTwo per lot with a principal dwelling, including two detached ADUsSDCI ADU page; SDCI code update page
TypesAADU (inside or attached to the house) and DADU (detached; includes a tiny house on a foundation)SDCI ADU page
Tiny houses on wheelsNot allowed as housing within city limitsSDCI ADU page
Parking, street improvements, MHADo not apply to ADUsSDCI ADU page
Separate saleNot by subdividing from the house; condo ownership and unit lot subdivision rules were updated in 2025SDCI ADU page; The Urbanist
Size and height1,000 sq ft above ground in NR zones; height up to 32 ft in NR zones (reported)The Urbanist (July 1, 2025)

How the Seattle ADU Permit Process Works

  1. Check your lot. Use the city’s ADUniverse feasibility tool and confirm environmentally critical areas, shoreline or historic overlays.
  2. Pick a path. A pre-approved DADU plan from ADUniverse is the fastest route; a custom design needs full plan review.
  3. Apply to SDCI. An AADU or DADU is a construction addition/alteration permit. Legalizing an existing unit is a construction permit to establish use.
  4. Sign the sewer capacity charge form. SDCI reports every ADU permit to King County, which bills a sewer treatment capacity charge.
  5. Coordinate with Seattle City Light if the ADU needs an electrical service change.
  6. Build and pass inspections.

Seattle ADU Rules That Trip People Up

  • The King County sewer capacity charge. It is billed by the county, not SDCI, so it is easy to leave out of a budget.
  • Tiny homes on wheels. Seattle treats them like camper trailers; they cannot be lived in as an ADU.
  • Critical areas. Steep slopes and other environmentally critical areas still add review time, pre-approved plan or not.
  • Old owner-occupancy covenants. Seattle dropped owner occupancy, and SDCI links a release form for older covenants recorded under the old rules.

Frequently Asked Questions

How many ADUs can I build in Seattle?

Two per lot with a house, and both can be detached, under the code that took effect June 30, 2025.

How long does a Seattle ADU permit take?

The city says a pre-approved DADU plan can be permitted in about 2 to 6 weeks in most cases. A custom design takes longer.

Do I need parking for an ADU in Seattle?

No. Parking requirements do not apply to ADUs in Seattle.

Do I have to live on the property?

No. Seattle removed owner occupancy in 2019, and state law (RCW 36.70A.681) bars it anyway.

What fees should I expect?

SDCI permit fees, which the city does not publish as a flat ADU number, plus a King County sewer capacity charge. Budget for both.

Sources

  1. Seattle Department of Construction and Inspections, Accessory Dwelling Units: https://seattle.gov/sdci/permits/common-projects/accessory-dwelling-units
  2. SDCI, Accessory Dwelling Units Code Updates: https://seattle.gov/sdci/codes/changes-to-code/accessory-dwelling-units-code-updates
  3. Seattle Office of Planning and Community Development, Encouraging Backyard Cottages: https://www.seattle.gov/opcd/ongoing-initiatives/encouraging-backyard-cottages
  4. The Urbanist, “Seattle eases accessory dwelling restrictions ahead of state deadline” (July 1, 2025): https://www.theurbanist.org/2025/07/01/seattle-eases-accessory-dwelling-restrictions-state-deadline/

For what the state requires, see our Washington ADU law guide. For budgets, see our Seattle ADU cost guide and our Seattle ADU builders.

This page is general information, not legal advice. Confirm current rules with SDCI before you design or apply.