Virginia's SB 531, codified at Va. Code 15.2-2292.4 (2026 Acts, chapter 895), takes effect July 1, 2027. Single-family zoning is deemed to allow one ADU as a permitted accessory use, and the ADU permit fee is capped at $500. Localities with an ADU ordinance adopted before January 1, 2026 are exempt, and HOA covenants still apply.

Bill: SB 531Effective: July 1, 2027Code: Va. Code 15.2-2292.4

Last verified: November 8, 2026 against the Code of Virginia, Section 15.2-2292.4 (law.lis.virginia.gov), and the ADU pages of Fairfax County, Arlington County, the City of Richmond and the City of Alexandria, and Loudoun County's Affordable Dwelling Unit program page.

SB 531 in One Paragraph

From July 1, 2027, every Virginia locality’s single-family zoning is “deemed to include” an accessory dwelling unit as a permitted accessory use, under Virginia Code 15.2-2292.4(B). The locality must issue the permit once you show the ADU complies with its ordinance, and the ADU permit fee cannot exceed $500. The law has two big exceptions: localities that adopted an ADU ordinance before January 1, 2026 are exempt, and HOA documents and recorded covenants are not overridden.

What Virginia’s ADU Law Actually Says

What a locality must allow

  • An ADU as a permitted accessory use in any single-family residential zoning district (15.2-2292.4(B)).
  • A permit issued on a showing of compliance with the local ordinance, with a permit fee of no more than $500, on top of any other applicable fees (15.2-2292.4(C)).

What a locality may still require (15.2-2292.4(D))

  • Rentals of 30 days or longer, which lets a locality ban short-term rental of the ADU.
  • Replacement of any parking the ADU removes, and a parking space for the ADU itself.
  • A floor area limit, but not below 350 square feet on lots under 2,500 square feet, or 500 square feet on other lots.
  • Compliance with building, fire and health codes.
  • Owner occupancy of either the house or the ADU, but not both, and only at the time of application.
  • That the ADU sit within 500 feet of the main house.
  • No ADU on a lot that already has more than one dwelling.
  • No separate sale of the ADU from the house.

What a locality may not require (15.2-2292.4(E))

  • Side or rear setbacks larger than the lesser of the house’s setback or the setback for other accessory structures.
  • Height, setback, lot size or frontage rules stricter than those for a single-family home.
  • A restrictive covenant as a condition of approval.
  • Street or other public improvements.
  • A family relationship between the people living in the two units.

Does Virginia’s ADU Law Apply to You?

Run through these in order.

  1. Is your lot in single-family residential zoning? If not, the state rule does not reach it. Check your locality’s zoning map.
  2. Did your locality adopt an ADU ordinance before January 1, 2026? If yes, Section 15.2-2292.4(I) says the new section does not apply to it, and your local ordinance controls. The enacted text has no further condition on that exemption.
  3. Will your permit be approved before July 1, 2027? If yes, subsection (G) leaves it under the rules in place when it was approved.
  4. Does your HOA or a recorded covenant ban ADUs? Subsection (F) says the law does not supersede covenants, condominium instruments, common interest community or cooperative documents, or property owners’ association rules. If yours bans ADUs, the state law does not help you.

If you clear all four, you have a by-right ADU from July 1, 2027. A locality can also adopt a substantially compliant ordinance before that date under subsection (H), so watch your county’s agenda this winter.

How Virginia Localities Apply It

This is the part nobody else has pulled together. Four of Virginia’s largest localities already had ADU rules before 2026, which means the exemption in subsection (I) likely applies to them. Whether an older, narrower rule (Fairfax County’s accessory living unit, for example) counts as an “ADU ordinance” for the exemption is not settled. Ask the zoning office in writing.

LocalityADU rules before January 1, 2026?How ADUs are approved todayWhat changes July 1, 2027SourceChecked
Fairfax CountyYes: “accessory living unit” under Zoning Ordinance 4102.7.BAdministrative permit, $285 fee ($75 renewal); unit inside the house, up to 800 sq ft or 40% of floor area, owner occupancy required, approval recorded; a detached ALU needs a special permit, a lot of 2 acres or more, and is capped at 1,200 sq ftLikely exempt under 15.2-2292.4(I); confirm with the countyFairfax County ALU pageOct 23, 2026
Arlington CountyYes: accessory dwelling rules in Zoning Ordinance 12.9.2; detached units allowed since May 18, 2019AD permit; owner must live in the house or the ADLikely exemptArlington accessory dwellingsOct 23, 2026
City of RichmondYes: ADU ordinance adopted September 25, 2023One ADU in residential districts with a single-family home, up to the greater of one third of floor area or 500 sq ftLikely exemptRichmond ADUsOct 23, 2026
City of AlexandriaYes: ADU policy approved by City Council January 23, 2021Permitted under the city’s ADU zoning rulesLikely exemptAlexandria ADUsOct 23, 2026
Loudoun CountyNot confirmed; the county’s “ADU” program is the Affordable Dwelling Unit housing program, not accessory unitsNot confirmed for accessory unitsState rule applies July 1, 2027 unless the county had an accessory unit ordinance before 2026Loudoun Affordable Dwelling Unit program (a different program)Nov 8, 2026
Prince William CountyNot confirmed on the county’s siteNot confirmedSameNo local guidance read as of Oct 23, 2026Oct 23, 2026
Virginia BeachNot confirmed on the city’s siteNot confirmedSameNo local guidance read as of Oct 23, 2026Oct 23, 2026
NorfolkNot confirmed on the city’s siteNot confirmedSameNo local guidance read as of Oct 23, 2026Oct 23, 2026
Chesterfield CountyNot confirmed on the county’s siteNot confirmedSameNo local guidance read as of Oct 23, 2026Oct 23, 2026
Henrico CountyNot confirmed on the county’s siteNot confirmedSameNo local guidance read as of Oct 23, 2026Oct 23, 2026

A naming trap in Northern Virginia. In Loudoun and Fairfax counties, “ADU” usually means an Affordable Dwelling Unit, a county housing program that offers moderate-income residents newly built townhouses and condos to buy, or apartments to rent below market. It has nothing to do with building a backyard unit. Loudoun’s ADU program page is about buying or renting those homes, with waitlists for both, and Fairfax calls its accessory units “accessory living units” (ALUs). If you search “Loudoun County ADU” or “Fairfax County ADU” for a backyard cottage, most results will be about the housing program.

Here is the irony. The localities that moved first on ADUs keep their own rules, including owner occupancy and Fairfax’s inside-the-house limit, while localities that did nothing get the state’s more generous floor. If you are in Fairfax and want a detached unit, SB 531 probably does not change your answer.

What an ADU Permit Costs in Virginia

The state caps the ADU permit fee itself at $500 under 15.2-2292.4(C). That is not your total. Building, trade and utility fees still apply, and the cap does not reach localities exempt under subsection (I), which is why Fairfax County can keep its own $285 administrative permit fee (plus renewals).

We do not have Virginia build cost data yet. For a starting point on construction, see our ADU cost guides and the detached ADU guide, and treat out-of-state numbers as a range, not a quote.

Step by Step for a 2027 Virginia ADU

  1. Find out whether your locality is exempt. Ask the zoning office whether it had an ADU ordinance before January 1, 2026. That one answer decides which rules you are under.
  2. Pull your HOA documents and deed. If they ban a second dwelling, stop here. SB 531 does not override them.
  3. Check the size and distance rules. Plan for the local floor area limit (no lower than 500 square feet on most lots), and keep the ADU within 500 feet of the house if your locality requires it.
  4. Plan parking. A locality may require one space for the ADU and replacement of any space you remove, so a garage conversion can trigger a new pad.
  5. Apply after July 1, 2027 if your locality is not exempt. A permit approved before then stays under the old local rules.

Common Mistakes With Virginia’s ADU Law

  • Assuming owner occupancy is gone. It is not banned. A locality may still require you to live in the house or the ADU when you apply.
  • Assuming the law beats the HOA. It does not. Subsection (F) protects covenants and association rules.
  • Assuming Airbnb is allowed. A locality may require leases of 30 days or more.
  • Applying in June 2027. An approval before July 1, 2027 is governed by the rules in place then.

How Virginia Compares

Virginia’s law is lighter than its neighbors’ in two ways: it keeps owner occupancy as a local option and it leaves HOAs alone. Maryland’s 2025 law took a different route, giving counties a deadline of October 1, 2026 to adopt their own ADU rules; see Maryland ADU law. For the full 2027 picture across states, see new ADU laws in 2027, and for every state’s status, our guide to which states allow ADUs.

Frequently Asked Questions

When does Virginia’s ADU law take effect?

July 1, 2027. Virginia Code 15.2-2292.4 is printed with that effective date, and a permit approved before then stays under the rules in place when it was approved.

Can my HOA stop me from building an ADU in Virginia?

Yes. Section 15.2-2292.4(F) says the law does not supersede recorded covenants, condominium or common interest community documents, cooperatives or property owners’ association rules. If your HOA bans ADUs, the state law does not override it.

Does Virginia require owner occupancy for an ADU?

Not statewide, but a locality may. Under 15.2-2292.4(D), a locality can require the owner to live in the house or the ADU, not both, and only at the time of application. Fairfax and Arlington, which are likely exempt, already require it.

Can I Airbnb an ADU in Virginia?

Only if your locality allows it. The law lets a locality require rental terms of 30 days or more, which rules out most short-term rentals. Check your local short-term rental ordinance too.

How much is an ADU permit in Virginia?

The ADU permit fee is capped at $500 under 15.2-2292.4(C), but building and other fees are charged on top. Exempt localities keep their own fees, such as Fairfax County’s $285 accessory living unit permit.

What does ADU mean in Loudoun or Fairfax County?

Usually Affordable Dwelling Unit, a county housing program for moderate-income buyers and renters, not an accessory dwelling unit. Fairfax calls a backyard or in-house unit an accessory living unit, and Loudoun has not published accessory unit guidance we could confirm.

Does my county have to follow SB 531?

Only if it did not adopt an ADU ordinance before January 1, 2026. Section 15.2-2292.4(I) exempts localities that did, and subsection (H) lets others adopt a substantially compliant ordinance before July 1, 2027.

Sources

  1. Code of Virginia, Section 15.2-2292.4 (effective July 1, 2027): https://law.lis.virginia.gov/vacode/title15.2/chapter22/section15.2-2292.4/
  2. Fairfax County, Accessory Living Unit: https://www.fairfaxcounty.gov/planning-development/zoning/accessory-living-unit
  3. Arlington County, Accessory Dwellings: https://www.arlingtonva.us/Government/Programs/Building/Permits/Accessory-Dwelling
  4. City of Richmond, Accessory Dwelling Units: https://www.rva.gov/planning-development-review/accessory-dwelling-units
  5. City of Alexandria, Accessory Dwelling Units in Alexandria: https://www.alexandriava.gov/zoning/accessory-dwelling-units-in-alexandria
  6. Loudoun County, Affordable Dwelling Unit program: https://www.loudoun.gov/1813

Disclaimer

This page is general information, not legal advice. Virginia’s ADU law does not take effect until July 1, 2027, and each locality will apply it through its own ordinance. Confirm the current rules with your local zoning office before you design or apply.

Related ADU laws

Other laws and rules in the same silo, kept in step as each one goes live.